The 7 days three error probable resulted from the usage of older cement in the mix, which experienced small clumps. These clumps may not have blended carefully, bringing about uneven distribution on the material and weaker bonding inside the Aircrete. This inconsistency lowered the compressive strength from the material, resulting in a visible dip